Tri-Theater Modular OT & Recovery Block
MSV Group executed a turnkey modular OT complex for a multi-specialty hospital in Chennai, delivering precision-engineered operating theaters, sterile support rooms and a digital command backbone for surgical teams.
Scope Delivered
Complete OT infrastructure from civil rework to validation and handover.
- Three ISO Class 5 operating rooms with modular walls, flush glazing and pendant booms
- Dedicated scrub, prep, clean utility and sterile storage connected via sterile corridor
- HVAC design featuring laminar diffusers, VAV boxes and pressure cascade logic
- Integrated nurse call, PACS display, OT lights and integration panels
- Post-operative recovery bay with medical gas and bed head systems
Key Systems Installed
Precision mechanical and digital systems for surgical excellence.
- Laminar ceiling with HEPA H14 filtration and temperature humidity control
- Advanced surgical control panels integrating HVAC, lighting and video
- Fire detection, medical gas alarms and UPS-backed critical circuits
- Antimicrobial vinyl floor with conductive underlay and smooth transitions
Project Outcomes
Operational agility and infection control gains for surgical teams.
- 30% increase in daily surgeries with optimised patient flow
- Significant reduction in airborne counts during theatre testing
- Positive feedback from surgeons on ergonomics and digital integration
Support & Training
Ensuring continuous uptime and compliance readiness.
- Clinical staff training on smart control panels and medical gas safety
- Structured maintenance program for HVAC, filtration and electrical systems
- Annual validation support for NABH and ISO 14644 audits
Planning Modular OT Infrastructure?
Let MSV Group deliver fully integrated OTs with best-in-class HVAC, controls and compliance documentation.
Start a Conversation